FEATURE
|
|
BENEFIT
|
No panel penetration is required over the building envelope other than at the end laps, and panel ends which are connected by a compression joint. |
Specially designed to seal out the elements. |
Panel side laps arrive at the job site containing a pre-applied sealant. |
Contributes to the system's weather tight construction and ease of installation. |
Optional product and weathertightness warranties. |
Severe weathertightness and additional customer confidence. |
Factory notched at both ends with pre-punched holes. |
Field installation can commence or finish from either end of building or on both sides simultaneously. |
End laps have a 16 ga. backup plate with pre-punched holes. |
Solid connection at end laps and proper fastener spacing. The prepunched holes improve installation and ensures proper panel placement. |
High or low clips. |
Accommodates variety of insulation systems including 1" thermal spacers at the purlins. |
UL 90. |
Lower insurance costs. |
80% less exposed fasteners than traditional side lap panels and all fasteners are long life. |
Increased weathertightness. |
Signature® 300 paint system. |
25-year finish warranty. |
The side lap has been tested for air infiltration and water penetration under ASTM E283 and E331 methods. |
Minimal air infiltration and water penetration and acceptability among specifiers. |